FEASIBILITY AND DESIGNBASIC:Constraints AnalysisBudget AnalysisDesign and Performance Goal ReviewConcept Design Options and ReviewExisting Conditions Evaluation and SurveysForensic Analysis and TestingHistoric Preservation Research and Criteria DevelopmentLife Cycle Cost-Benefit AnalysisSystem Remediation StudiesDesign Constraints and Performance CriteriaMaterials Research and EvaluationBudget ReviewDevelopment of Design OptionsSketch DetailingPreliminary Façade, Glass, and Climate EngineeringOutline SpecificationsLEED Criteria SupportSystem Details and SpecificationsCoordination with Building Structure and M.E.P. DesignThermal ModelingPreliminary System Design EngineeringBudget ReviewSpecialized Structural Glass Design and EngineeringWind Tunnel Testing, R.F.P. Scope and AnalysisMaterials Selection, Sourcing, and Data AnalysisCoordination with Project ConsultantsBudget Review- Final Material(s) Selection and Specification
- Contract Document Details
- Contract Document Specifications
- Visual Mock-up Specification and Review
- SUPPLEMENTAL:
- Climate Analysis and Modeling
- Energy and Thermal Modeling
- Complex Geometry Modeling and Analysis
- Double Skin Façade Analysis and Modeling
- New Material Development and Testing
- Daylighting Analysis and Modeling
- Acoustic Analysis and Design
- Snow and Ice Studies
- Comprehensive Energy and Thermal Modeling
- Blast Engineering and Design
- Building Code Reconsideration or Variation Appeals
- Wind Tunnel Testing Oversight at the Laboratory
- Design Build or Design Assist Services
- Peer Review
- Finite Element Analysis
- C.F.D. Model Coordination and Design Integration
- LEED Compliance Submittals
- Blast Design or other Specialized System Design Testing
- BID NEGOTIATION
- BASIC:
- Subcontractor Pre-qualification
- Bid Form Review
- Bid Proposal Analysis and Evaluation
- Technical Design Negotiation Services
- Value Engineering
- Subcontractor Pre- and Post-Bid Interviews
- CONSTRUCTION ADMINISTRATION
- BASIC:
- Review of Subcontractor’s and Suppliers’ Quality-Control Program(s)
- Shop Drawing Review
- Engineering Calculations Review
- Material Submittals and Specification Data Review
- Visual Mock-up Review
- Performance Mock-up Submittals Review
- Performance Mock-up Installation Inspections
- Performance Mock-up Testing Oversight
- Field Testing Oversight
- Factory Inspections
- Site Inspections
- Punch-List Review
- SUPPLEMENTAL:
- Blast Mock-up Submittals Review
- Blast Mock-up Installation Inspections
- Blast Mock-up Testing Oversight
- Material Supplier Factory Q.C. Inspections
- N.Y.C. D.O.B. Special (Controlled) Inspections
- Post-Construction Services